Skip to main content
Procore Support (en-au)

Add a Line Item to a Commitment's Schedule of Values

Objective

To add a line item to the Schedule of Values (SOV) on a commitment

Background

After you create a commitment, use the steps below to add line items to the Schedule of Values. 

Things to Consider

  • Required User Permissions:
    • 'Admin' level permissions on the project's Commitments tool.
  • Additional Information:
  • For companies using the icon-erp-synced2.png ERP Integrations tool: Show/Hide  

    • In order to send the commitment to the ERP Integrations tool to be accepted for export by an accounting approver:
      • Integration by Ryvit. The commitment must have at least one (1) SOV line item with a Integration by Ryvit phase code. In addition, the cost code must be assigned to at least one (1) category. See Assign Default Cost Types To Integration by Ryvit Cost Codes). Important! When a commitment is exported to Integration by Ryvit, it must have a unique commitment number. Procore recommends that the numbering convention you set up for the Commitments tool is preceded by the Project Number and then uses the default numbering system. For example, if your Project Number is 001, your numbering system would be 001-001, 001-002, 001-003 and so on. 
      • QuickBooks® Desktop. The commitment must have at least one (1) SOV line item with a QuickBooks® Desktop cost code. The cost code does not need to be assigned to a category, because QuickBooks® Desktop does not support the category concept.
      • Sage 100 Contractor®. A commitment must have one (1) SOV line item with a Sage 100 Contractor® cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.
      • Sage 300 CRE®. The commitment must have at least one (1) SOV line item with a Sage 300 CRE® cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.
      • Viewpoint® Spectrum®. The commitment must have at least one (1) Schedule of Values (SOV) line item with a cost code from the Viewpoint® Spectrum® project. The cost code must be assigned to at least one (1) category. Category assignments must always be updated in Viewpoint® Spectrum®. 
      • Yardi Voyager®. The commitment must have at least one (1) SOV line item with a Yardi Voyager® cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Refresh the Yardi Voyager® Cost Codes on a Project.
      • Sage Intacct®. The commitment must have at least one (1) SOV line item with a Sage Intacct® cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.
      • Acumatica Cloud ERP. The commitment must have at least one (1) SOV line item with a Acumatica Cloud ERP cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.
      • MRI Platform X®. The commitment must have at least one (1) SOV line item with a MRI Platform X® cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.
      • Xero™. The commitment must have at least one (1) SOV line item with a Xero™ cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.

    For companies using the icon-erp-synced2.png ERP Integrations tool: Show/Hide  

    • In order to send the commitment to the ERP Integrations tool to be accepted for export by an accounting approver:
      • MYOB Advanced Construction. The commitment must have at least one (1) SOV line item with a MYOB Advanced Construction cost code. In addition, the cost code must be assigned to at least one (1) cost type. See Assign Default Cost Types To Cost Codes.

Prerequisites

Steps

  1. Navigate to the project's Commitments tool.
  2. Under the Contracts tab, locate the commitment to update. Then click Edit.
  3. Click Schedule of Values.
  4. Click Add Line.
     Note
     If the 'Enable Always Editable Schedule of Values' setting is turned ON in the Commitments tool, users with the required user permission to Edit a Commitment can modify the Schedule of Values while a commitment is in any status. To learn more, see What is the 'Enable Always Editable Schedule of Values' setting?
  5. Follow the appropriate steps depending on whether your accounting method is Amount Based or Unit/Quantity Based:
     Note
    To edit your accounting method before adding SOV line items, see Edit the Advanced Settings Tab on a Commitment. To learn more, see How do I set the accounting method for a contract or funding?
    1. For contracts using the Amount Based accounting method:
      1. #
        Automatically enters a line item number in sequential order. 
      2. Change Event Line Item
        If you have change events enabled, you can select a change event line item if the commitment needs to be linked to a change event. 
      3. Budget Code
        Select a budget code from the list or click Create Budget Code to create a new one. See What is a budget code in Procore's WBS? 
      4. Description
        Enter a description for the line item. For example, type: Monthly Service Fee
      5. Amount
        Enter the amount of the cost.
      6. Billed to Date
        The system automatically calculates the amount billed on the commitment up to the current date.  
      7. Amount Remaining
        Enter the amount that has NOT been billed to the current date. 
      8. Tax Code
        Enter a tax code to use for this line item. This field only appears if you have enabled the tax codes feature. See How can I use tax codes on a project?
    2. For contracts using the Unit/Quantity Based accounting method:
      1. #
        Automatically enters a line item number in sequential order. 
      2. Change Event Line Item
        If you have change events enabled, you can select a change event line item if the commitment needs to be linked to a change event. 
      3. Budget Code
        Select a budget code from the list or click Create Budget Code to create a new one. See What is a budget code in Procore's WBS? 
      4. Description
        Enter a description for the line item. For example, type: Monthly Service Fee
      5. Qty
        Enter the number of units.
      6. UOM
        Enter the Unit of Measure (UOM).
         Notes
      7. Unit Cost
        Enter the Unit Cost in the box provided.
      8. Amount
        The system automatically calculates the subtotal for you, based on the QtyUOM, and Unit Cost entries. 
      9. Billed to Date
        The system automatically calculates the amount billed on the commitment up to the current date. 
      10. Amount Remaining
        Enter the amount that has NOT been billed to the current date. 
      11. Tax Code
        Enter a tax code to use for this line item. This field only appears if you have enabled the tax codes feature. See How can I use tax codes on a project?
  6. Choose one of these options:
    • Save. Click this button to save the changes to the SOV. 
    • Save & Email. Click this button to save the change to the SOV and email the updates to the progress claim contact.