Update the Schedule of Values on a Head Contract
Background
After creating a contract, you can choose from three (3) methods to update line items to your contract's SOV:
- Add Line Items to the SOV
If your contract's SOV only has a few line items or if you want to manually add new line items to the SOV, use the 'Add Line' button to manually enter each SOV line item.
- Create the SOV from the Project's Budget
If your want to structure your contract's SOV to match your budget line items, Procore gives you an option to import your SOV line items directly from the Procore's Budget tool. This method automatically creates the contract's SOV for you using your project's budget line items as its data source.
- Import the SOV from a CSV File
If you would prefer to build your contract's SOV using a spreadsheet program, such as Microsoft Excel, you can download a blank template that matches your contract's table structure, add your SOV line items to the spreadsheet, save the file to the Comma Separated Values (CSV) file format and then import your line items. You can also use the import process to replace all existing line items on your contract's SOV or you can keep any existing line items and add additional ones.
Things to Consider
- Required User Permissions:
- 'Admin' level permissions on the project's Head Contracts tool.
- Additional Information:
- Limitations:
Steps
There are several ways to add and update line items on a contract's SOV:
Add Line Items to the SOV
- Navigate to the project's Head Contracts tool.
- Locate the contract to update and click its Number link.
- Click the Schedule of Values tab.
- Click Add Line.
- Complete the data entry as follows:
- Budget Code
Select a budget code or click Create Budget Code. See What is a budget code in Procore's WBS?
- Description
Enter a description for the line item. For example, type: Monthly Service Fee
- Qty
Enter the number of units.
- UOM
Select a Unit of Measure (UOM) from the drop-down list. To learn about the default selections in this list, see Which units of measure are included in Procore's master list? and Add a Unit of Measure to the Unit of Measure Master List.
- Unit Cost
Enter the cost per unit in this box. You'll notice that the value in this column contains four (4) decimal points (for example, $0.0000) to allow you to enter the specific value required to calculate accurate pricing.
Example
If you are buying 50,000 units for $1,006,625.00, you would enter a unit price of $20.1325.
- Amount
The system automatically calculates the subtotal for you, based on the Qty, UOM, and Unit Cost entries.
- Repeat the above steps for all line items.
Tip
Want to arrange the line items on your schedule of values into groups? Click the
Add Group menu and select the desired grouping options. The default options include
Cost Code, Cost Type, Sub Job (if enabled), as well as any custom segments that have been added for your company or project. See
What are Segments and Segment Items.
- Choose one of these options:
- Click Save
OR
- Click Save & Email.
Import the SOV from a CSV File
- Download a CSV Template
- Add Line Items to a CSV Template
- Import the Completed CSV Template to Procore
Download a CSV Template
- Navigate to the Head Contracts tool.
- In the table, click a Number link to open the contract.
- Under the General tab, click Schedule of Values.
- In the Schedule of Values card, click Edit.
This places the SOV into edit mode
- Below the table, click Import and choose SOV from CSV.
This opens the Import Schedule of Values from CSV window.

- Expand Customise CSV Delimiter.
- Choose a delimiter for the template file: Comma or Semicolon.
The system's default option is Comma.
- Click Download CSV Template and choose: Blank Template or Template with Existing Line Items.
The downloads the selected template to your web browser's configured location.
Add Line Items to a CSV Template
- Open the downloaded template in a spreadsheet editor.
- Enter the line item data using the appropriate accounting method for the head contract. See How do I set the accounting method for a contract or funding?
- How to enter data for amount-based accounting: Show/Hide
- To import a head contract using the amount-based accounting method, enter data as follows:
- How to enter data for unit/quantity-based accounting: Show/Hide
- To import a head contract using the amount-based accounting method, enter data as follows:
Import the Completed CSV Template to Procore
- Navigate to the Head Contracts tool.
- In the table, click a Number link to open the contract.
- Under the General tab, click Schedule of Values.
- In the Schedule of Values card, click Edit.
This places the SOV into edit mode.
- Below the table, click Import and choose SOV from CSV.
This opens the Import Schedule of Values from CSV window.

- Upload the file as follows:
- Click Upload File and select the completed template to upload.
OR
- Drag-and-drop the completed template to the CSV File area.
- Depending on the state of your head contract, choose the appropriate option:
- To add more line items to the head contract, select Add Additional Line Items, then click Import.
- To replace all existing line items on the head contract with the template, select Replace Existing Line Items, then click Import.
Procore imports the template and displays a success banner. If you see an error message, click Show Error to learn why the import failed.